Gurara Gold Mine Project

Quick Facts

Sofon Kushaka, Nigeria

Location

Gold

Resource

206.25 MT

Reserves

2.33g/t au

Quality

Exploration

Phase

The Federal Government of Nigeria granted Twilight Technical Ltd 23812EL to explore and mine gold and other associated minerals in 2017. Twilight Technical Ltd, has since commenced a gold exploration program on the exploration license 23812EL in June 2017.

The exploration program included desk study, detailed geological and structural mapping on a scale of 1: 10,000, ground magnetic and time-domain induced polarization surveys of the entire area.

Based on the results obtained so far, the property has good potential for both primary and colluvial gold mining activities. While the primary gold is predominantly within the uplifted 1.5 by 3.5km shear zone near the centre part of the site, the colluvial and alluvial prospects are ongoing at the base of the uplands, as well as along the river banks respectively.

Projected primary gold ore reserve up to 30m depth is estimated to be 206,250 Tonnes.

Based on the available data, at a processing capacity of 300T per day, the mine life is about 3 years.

Quick Links

Get in Touch

Please fill out the form below and a member of our team will contact you as soon as possible