Segilola Gold Project

Osun, Nigeria

Thor’s most advanced project is the Segilola Gold Project, located in Osun State Nigeria, which The Segilola Gold Project is considered Nigeria’s most advanced gold project with an indicated resource of 556,000 ounces grading at 4.2g/t, an inferred resource of 306,000 ounces grading at 4.7g/t and a probable reserve of 448,000 ounces grading at 4.2 g/t.

In addition to the Segilola Project, Thor holds a 70% interest in the Douta Gold Project located in south-eastern Senegal. The Douta Gold Project lies within the Kénéiba Inlier, which hosts significant gold resources and has attracted major international mining companies. Thor is currently advancing the Makosa Discovery in its Douta Licence following a successful RC drilling campaign in 2017.

High

Exploration

Partner

No

Thor Explorations Ltd.

Related Listings

Itakpe-Ajaokuta Ore Rail Line, Nigeria

Kogi State, Nigeria

Good

Licensing Round

Pinpoint

Key Information Location Ajabanoko, Adavi, LGA Kogi State Deposit  Hematite and Magnetite Exploration Status Ongoing Reserves 62 million tonnes Iron Content 36. Read more…

Burkina Faso

South Hounde

Medium

Licensing Round

Pinpoint

Sarama has an established project pipeline ranging from scoping level through to early-stage exploration in the Houndé and Banfora gold belts Houndé Belt is well established and hosts Endeavour, Semafo & Roxgold mines with recent discoveries at Kari Pump (Endeavour) & Golden Hill (Teranga) Banfora Belt very under-explored and ripe… Read more…

Gidan Jaja, Zamfara

Zamfara State, Nigeria

Good

Licensing Round

Pinpoint

Key Information Location Gidan Jaja, Zurmi LGA, Zamfara State Deposit  Magnetite Exploration Status Ongoing Reserves Over 50 million tonnes (Preliminary estimation) Quality Over 70% Geology:  It occurs as magnetite in the in the migmatite suites of the basement complex of Northern Nigeria in association with gneisses, granites, amphibolites, phylites and… Read more…