Sabodala Gold Project/Mine

Sabodala, Senegal

Key Information:

Location

Approx. 700km south-east of Dakar, Senegal

Deposit

Gold

Project Status

Production

Reserves

3.73Moz Measured & Indicated

Quality

1.64 g/t Au, 13 year mine life

Geology:

The Sabodala gold project is situated in the Mako Mafic Volcanic Belt and lie within the west Birimian gold province, which is host to some of the world’s largest gold deposits. Sabodala is sited on a small hill of unweathered metabasalts. Locally, the volcanics are intruded by subvolcanic dolerite and gabbro sills and dykes, as well as quartz-feldspar porphyry and unfoliated rhyolite dykes. The gold mineralisation is associated with quartz, sericite, ankerite/siderite veining and orange-coloured silica-albite-carbonate-pyrite alteration. The main sulphide mineral is pyrite, although free gold does occur.

Project Owner:

Teranga Gold Corporation a Canadian based gold company owns 90% of the Sabodala concession while the government holds a 10% stake in the mine, and revenues generated are from taxes, royalties and dividends.

Project Status:

The Sabodala gold mine project is the only large scale gold mining operation in Senegal and it has been in operation since 2009. Multiple deposits feeding into central mill; owner-operated conventional truck and shovel open-pit mining.

As of December 2019 241,276 oz of gold has been mined.

Available Data:

  • Technical Report

Good

Production

Onshore

Yes

Teranga Gold Corporation

Listing Information

East Senegal, Sabodala, 700km from Dakar.

Related Listings

Al Khunayqiyah Saudi Arabia

200km West of Riyadh

Good

Pinpoint

Key Information: Location 200KM West of Riyadh, Saudi Arabia Deposit Zinc-Copper Project Status Development Reserves Proved and Probable JORC Reserves of 26.1Mt Quality 3.3% Zn and 0.24% Cu. Read more…

Koton Karfe, Nigeria

Kogi State, Nigeria

Good

Licensing Round

Pinpoint

Key Information Location Koton-Karfi, Koton-Karfi LGA, Kogi State Deposit Limonite magnetite, goethite hematite Exploration Status Detailed exploration by National Steel Raw Materials Exploration Agency Reserves 850 million tonnes Quality 51. Read more…

Al 'Ajal, Oman

160km away from Muscat, Oman.

Good

Pinpoint

 Key Information: Location 160km away from Muscat, on Nizwa-Sinaw Highway, and approximately 355km from Sohar Port. Deposit Copper Project Status Development  Reserves Estimated 9.7 Mtonnes Quality 0/88% Cu and 0. Read more…