Key Information:

Location

North-eastern Sudan

Deposit

Gold

Project Status

Production

Reserves

Proven and probable reserves: 14.09mt; Measured and indicated resources: 16.06mt; Inferred resources: 4.3mt

Quality

2.77g/t Au

Geology:

The Hassai gold deposits are hosted within the Proterozoic-aged Ariab greenstone belt. The country rocks include basic and acidic volcanic rocks, tuffs and greywackes that are intruded by late granites. Several mineralised deposits are hosted within specific stratigraphic units of the Ariab series.

The Ariab series is structurally divided into five units. Unit A is the basalt unit intruded by diorite and gabbro. Andesitic and dacitic lavas along with pyroclastic rocks are hosted in Unit B, a thick intermediate unit. The third unit designated C is acidic in nature and includes sodium-rich rhyolitic and rhyodacitic lavas, tuffs and domes. This unit is further segmented into two subunits C1 and C2.

The main mineralised lithostratigraphic interval in the series is unit D that contains massive sulphide and gold deposits. The unit is between 10m and 100m-thick and discontinuous. It mostly forms the top part of the massive sulphides. It includes intermediate-mafic lavas that lie above the acidic volcanic rocks of the C2 subunit of unit C. Unit E includes a thick complex of sedimentary rocks that overlie the volcanic rocks. Sedimentary rocks in this unit have been metamorphosed to green schist facies.

Project Owner:

La Mancha Resources, through its subsidiary, owns 40% of the mine. The remaining is held by Ariab Mining Company, who is also the operator.

Project Status:

The Hassai gold mine is an open pit mine located in the Red Sea Hills desert in north-eastern Sudan, approximately 50km from Khartoum. It is the only gold producing mine in Sudan. It began operations in 1992 and has produced 2.3 million ounces (Moz) of gold till date from 18 open pits.

Infrastructure:

A 160km pipeline with a designed carrying capacity of 7.7 million cubic metres of water per year is in the planning stage. To cut costs, a single pipeline will be constructed instead of two smaller pipelines.

It will provide sufficient water to support a 5mtpa flotation plant that might be added to process the ore from the VMS deposits. Approximately 4.1 million cubic metres of water will be annually required for the processing activity.

Good

Production

Onshore

Ariab Mining Company

Listing Information

50km East of Khartoum

Related Listings

Ruhango, Rwanda

Nyamyase Exploration Block: PTA N-2

Unknown

Licensing Round

Pinpoint

Key Overview: Location Nyarusange sector of Muhanga district and Mwendo of Ruhango district Deposit 3Ts, Coltan, Cassiterite Project Status Exploration Size 2,175 ha Licence Situation No Licenses Issued Geology: Southernly extension of granite from Gatumba mining area, with significant structural complexity and known 3T occurrences. Read more…

Osun, Nigeria

Osun, Nigeria

High

Pinpoint

Thor’s most advanced project is the Segilola Gold Project, located in Osun State Nigeria, which The Segilola Gold Project is considered Nigeria’s most advanced gold project with an indicated resource of 556,000 ounces grading at 4.2g/t, an inferred resource of 306,000 ounces grading at 4. Read more…

Tajimi, Nigeria

Kogi State, Nigeria

Unknown

Licensing Round

Pinpoint

Key Information Location Tajimi, Lokoja LGA, Kogi State Deposit Hematite and Magnetite Exploration Status Ongoing Reserves 20 million tonnes (Preliminary Est.) Iron Content 22-40% Geology and Mineralization:  The Ores are mainly hematite and magnetite. Read more…