CBG Bauxite Project

Boke, Guinea

Key Information:

Location

Boké, Western Guinea, close to the border with Guinea-Bissau.

Deposit

Bauxite

Project Status

Production

Reserves

Proven reserves total sum of 2,300mt with additional probable reserves of 18,600mt

Quality

Between 40% and 50% aluminium oxide (Al2O3)

Geology:

Bauxite deposits are found across much of western and central Guinea, having been formed by the tropical weathering of underlying, aluminium-rich rocks. The deposits are typically close to the surface. Proven reserves total some 2,300Mt with additional probable reserves of 18,600Mt, most of which contains between 40% and 50% aluminium oxide (Al2O3).

CBG’s operations are based on three main ore zones – Sangarédi, Bidikoum and Silidara, with further resources at the N’danga, Boundou Waade and Paravi deposits. Each deposit contains several different types of ore, varying in both grade and physical properties.

Its existing resource totals over 300Mt grading 51% Al2O3, sufficient to support production at current rates for at least 25 years. Historically, grades in Sangarédi have been 56–58% Al2O3, while ore in Bidikoum averages 50% and Silidara 52%.

In 2006, CBG signed an agreement with the Guinean government and Global Alumina over granting Global Alumina access to some of the CBG bauxite reserve areas. In return, CBG will have future access to some 2,000Mt of bauxite resource that lie outwith its current concession.

Project Owner:

CBG was established in the early 1970s as a 49:51% joint venture between the Guinean government and the Halco partnership, originally comprising a group of international aluminium industry participants. Since 2004, Alcoa and Rio Tinto Alcan have each had a 45% stake in Halco, having gradually bought out most of the other founder members. In mid-1999, the government invited Alcoa to take over management of the project.

Project Status:

While Sangarédi was the orebody on which CBG’s operations were founded, today between 85% and 90% of its output of raw bauxite comes from the Bidikoum and Silidara pits. After stripping any thin overburden, the ore is blasted and then loaded using hydraulic excavators into haul trucks for transport to the mine stockpiles.

Bench heights of up to 8m allow most of the ore to be mined in one horizontal pass. The mining fleet consists of Demag H185 excavators, Caterpillar 992C and 992D wheel loaders, and 17 Caterpillar 777B and 777D trucks.

Run-of-mine ore is stockpiled in long piles that run parallel to the mine’s rail sidings, with material from the different pits being tipped in layers to give a consistent blend. The stockpiles are then reclaimed using Caterpillar 992s that dump directly into rail wagons alongside. About two hours is needed to load each 100-wagon train, each car carrying around 82t of bauxite. Five or six trains carry ore from the mine to Kamsar each day.

Available Data:

  • Geological maps
  • Reports
  • Assays

Infrastructure:

Connected by rail to Kamsar.

Good

Production

Onshore

Compagnie des Bauxites de Guinee (CBG)

Listing Information

Boké, Western Guinea.

Related Listings

Ruhango, Rwanda

Mubuye Sector

Unknown

Pinpoint

Key Overview Location Mbuye sector of Ruhango district Deposit Gemstones Project Status Exploration Size 5,510 ha Licence Situation No Licenses Issued Geology/Mineralization: Gemstones, dominated by aquamarine (Beryl) ,hosted in pegmatites , amethyst. Pegmatites thickness varies between approximately 0.5m to 4m  and extends to about 800m following a N150° trend. Read more…

Potiskum, Nigeria

Yobe State, Nigeria

Medium

Licensing Round

Pinpoint

Key Information Location Gidan Buzu, Nengere LGA, Yobe State Deposit Hematite and Magnetite Exploration Status Ongoing Reserves Over 65 million tonnes (inferred) Quality Above 70% Geology:  The iron ore occurs within the Chad basin and is covered by an average lateritic cover of 3m and underlain by sandstone. Read more…

Bougouni, Mali

Bougouni, Kola, Kenie Regions of Mali

Good

Pinpoint

Key Information: Location 180km south of Bamako capital of Mali Deposit Lithium Project Status Development, expected production start: second half of 2021 Reserves 21.3Mt Mineral Resource Quality Sogola-Baoule: 12.2Mt at 1.1% Li2O, Ngoualana: 5.1Mt at 1.2% Li2O (9% increase),  Boumou: 4Mt at 1. Read more…