Bougouni Lithium Project

Bougouni, Mali

Key Information:

Location

180km south of Bamako capital of Mali

Deposit

Lithium

Project Status

Development, expected production start: second half of 2021

Reserves

21.3Mt Mineral Resource

Quality

Sogola-Baoule: 12.2Mt at 1.1% Li2O, Ngoualana: 5.1Mt at 1.2% Li2O (9% increase), 

Boumou: 4Mt at 1.02% Li2O (81% increase)

Geology:

The Bougouni ore body comprises of pegmatites hosted in an intruded sequence of the Birimian age pelitic metasediments and amphibolites of the Leo-Man Shield.

 

Project Owners & Status:

Bougouni Lithium project is 100% owned by Kodal Minerals. 

Kodal has implemented an accelerated exploration and development programme aimed at advancing the project into production in as short timeframe as practicable. In February 2019, the Company announced an updated JORC Mineral Resource for the Bougouni Project of 21.3Mt at 1.11% Li2O, with 11.6Mt at 1.13% Li2O in the Indicated category and 9.7Mt at 1.08% Li2O in the Inferred category. This updated Mineral Resource is 23% higher than the original Maiden Mineral Resource released in September 2018, with over 55% of the Resource now in the Indicated category.

 

Available Data:

  • JORC
  • Drill results
  • Assay

 

Infrastructure:

The Bougouni project area can be accessed through an existing sealed road from Bamako. Since the project is located in a remote location, internationally sourced goods, reagents, and consumables will be delivered to the site through Abidjan or San Pedro ports in Côte d’Ivoire.

Kodal Minerals also signed a memorandum of understanding (MoU) with Mali Lithium, the developer of Goulamina lithium project in the same region, to review the establishment of certain common infrastructure facilities for both the projects in January 2020.

Good

Exploration

Onshore

Kodal Minerals

Listing Information

Bougouni, Kola, Kenie Regions of Mali

Related Listings

Itakpe, Advani, Kogi State

Kogi State, Nigeria

Good

Licensing Round

Pinpoint

Key Information Location Itakpe, Adavi, LGA Kogi State Deposit Hematite and Magnetite Exploration Status Completed by Exploration and Mining Division of Nigeria Steel Development, /V/O Techno export of former USSR Reserves 310 million tonnes Iron Content 15%-65% Geology and Mineralisation:   – Within the Pre-Cambrian cystaline rocks. Read more…

Akjoujt, Mauritania

4km to the west of Akjoujt town, Inchiri region.

Good

Pinpoint

Key Information: Location 4km to the west of Akjoujt town in the Inchiri region (Mauritania) Deposit Copper Ore Project Status Production Reserves Total Measured + Indicated at 23.7 Mtonnes Quality 22. Read more…

Pharmacie Liptako, Niamey, Niger

Niger Republic

High

Farm Out

Pinpoint

Exploration work on the Bouli and Tringui-3 permits was managed by RPM Global (Independent Consultant) for Summa from February 2016 to March 2017 and consisted of stream sediments, soil geochemistry, trenching, RAB and core drilling. Read more…